Four Pelagic Trawlers in port at Lerwick on 4th August 2022. In the foreground are the 2,809gt Altaire and the 2,974gt Antares and in front of them are berthed the 2,719gt Adenia and the 2,934gt Zephyr.
The Altaire of Interfish Ltd., operated by LHD Ltd. was built in 2004 by Sedef Gemi Endustrisi at Tuzla and completed by Solstrand, at Tomrefjord. The Antares of LHD Ltd. was built in 2016 by SIMEK at Flekkefjord.
The Adenia of LHD Ltd. was built in 2019 by Zamakona at Santurtzi. The Zephyr also of LHD Ltd. was built in 2019 by Marine Projects at Gdansk.
Photo: Nigel Lawrence
Comments
Sorry, comments are closed for this item